Ford Street Development

Ames, Iowa
Ford Street Development Warehouse

Story Construction was the design-builder for this warehouse/distribution facility that was completed for a private developer in the Ames Community Development Park.

 The structure incorporates a concrete slab on grade with a Butler pre-engineered metal building system, and precast concrete wainscot walls with a standing seam metal roof.

 Features include 24’ clear height ceilings, six loading dock areas and a fire sprinkler system.

  • Client: Fort Street Development Co.
  • Industry: Industrial
  • Delivery Method: Design + Build
  • Designer: Story Design Ltd.
  • Project Size: 66,000 square feet

Industrial

  • Sauer Lawrence Aerial Sauer Danfoss Inc. – New Manufacturing Facility
  • Patterson Dental Interior Patterson Dental Supply
  • Interpower Front Exterior Interpower Corporation
  • Generation Repair & Service Entry Generation Repair & Service
  • Washington Biodiesel Biodiesel Plants
  • Ford Street Development Warehouse Ford Street Development
  • Colorbiotics Entry Colorbiotics
  • Cargill CO2 Addition Cargill Meat Solutions
  • Ball Corp Main Entrance Ball Corporation