Fort Dodge Wastewater Treatment Plant

Designer: McClure Engineering Company

This WWTP improvements project included constructing a four-train vertical loop reactor, a 100-foot-diameter final clarifier and scum pump station, a 65-foot-diameter aerobic digester tank and two blower buildings. Work also included associated piping, electrical, controls, demolition, grading and paving. The project incorporated approximately 5,500 cubic yards of poured concrete and 530 tons of rebar in its various structures.